Projects List

New dormitory

The creation of a large new dormitory has enabled us to move from three tier to two tier beds, and to ensure each child has their own individual space.

Phase 1

Complete

Budget £

Donate

Classrooms

All classrooms have had new floor tiling and been decorated throughout

Phase 1

Complete

Budget £

Donate

Primary School Lunchshade

Enabling children to sit outside and eat or socialise in both sunshine and rain

Phase 2

Complete

Budget £

Donate

New Boys Toilet Block

Creating accessible toilets for the boys dormitory area

Phase 2

Complete

Budget £

Donate

Fire escapes

We have created fire escape routes as required for all dormitories

Phase 2

Complete

Budget £

Donate

Bunk Beds

Previously, some children were sharing beds and the beds were triple bunks. With the creation of the new dormitory, we have now reconfigured all beds to double bunks, and each child has their own individual bed.

Phase 2

Complete

Budget £

Donate

Kitchen counters

Renovation to the kitchen counters to ensure hygeine and cleanliness.

Phase 2

Complete

Budget £

Donate

New shower block

A new shower block has been built for the girls dormitory area

Phase 2

Complete

Budget £

Donate

Senior School Dining Tables

Children are now able to eat their meals comfortably inside

Phase 2

Complete

Budget £

Donate

New Desks

We have new desks for our senior school. We especially enjoyed the unique delivery method!

Phase 2

Complete

Budget £

Donate

Fire Equipment

Fire extinguishers have been installed throughout the school

Phase 2

Complete

Budget £

Donate

Connect to Mains Sewage

This was a major project requiring the purchase of land behind the school to access the main sewage. It has made such a difference to the school.

Phase 2

Complete

Budget £

Donate

Kindergarten Desks

At present the children's possessions are stored in boxes, generally kept at the end of each bed. For fire safety reasons we need to move these onto racks.

Phase 2

Complete

Budget £

Donate

Ministry of Education

In April 2025 the Ministry of Education inspectors added a number of additional requirements which we have been able to fund from existing resources. This includes benches under the lunch shade, First Aid kits, Whiteboards for teaching, upgrade to science lab, fresh water point.

Phase 2

In Progress (Funded)

Budget £

10000

Cooking Gas System

Most of our cooking is done by traditional fire. Catering for 600 children we want to convert this to a gas system

Phase 3

Fundraising in Progress

Budget £

800

Racks for Boxes

Boxes are currently stored at the end of beds but need to be moved to racks because of fire hazard.

Phase 3

Fundraising in Progress

Budget £

1000

Kindergarten Playground

Our kindergarten playground needs to be enhanced to create a safe and pleasant space in which the children can play.

Phase 3

Fundraising in Progress

Budget £

3000

Kitchen Toilet & Cloakroom

Provide a separate toilet and cloakroom for kitchen staff

Phase 3

Fundraising in Progress

Budget £

2000

Agricultural Workshop

As part of our focus on vocational training this will provide a location to improve agriculture

Phase 3

Fundraising in Progress

Budget £

2000

Gutters

Gutters need replacing a fixing to keep dormitories and classrooms dry

Phase 3

Fundraising in Progress

Budget £

1000

Fencing of new land

We need to erect new fencing around the Vocational Centre and the land to the rear. This extends quite some distance to the sewage pipe entrance you can see at the very back of the picture

Phase 3

Fundraising in Progress

Budget £

2000

Perimeter Wall

We need to erect a new stone/concrete wall for security purposes, replacing the existing corrugated iron fence which has been patched up.

Phase 3

Fundraising in Progress

Budget £

20000

Modern Toilets

This is an ongoing project to replace all toilets, which were traditionally flat holes, with modern flushable toilets.

Phase 3

Fundraising in Progress

Budget £

5000

Metal Roofing

Repair of old metal roofing which leaks during the rainy season

Phase 3

Fundraising in Progress

Budget £

3000

Staff Quarters

Many teachers live on site and the conditions are currently unacceptable by any measure.

Phase 3

Fundraising in Progress

Budget £

8000

Move Reception Area

As required by the Ministry of Education to put the reception in a more central and visible location

Phase 3

Fundraising in Progress

Budget £

2000

Sick Bay

A place where children can convalesce without passing any sickness to others.

Phase 3

Fundraising in Progress

Budget £

1000

Water Management Sustainability

With 600 students and 40 staff, waste is considerable and upgrades required to ensure long-term sustainability

Phase 3

Fundraising in Progress

Budget £

2000

Vocational Centre

This is one of our most exciting projects. We are turning this newly acquired building into a vocational centre to meet curriculum requirements, and ensure each child leaves school with a clear pathway for the future.

Phase 3

Fundraising in Progress

Budget £

20000

Sports Field

Repurposing the central area by compacting and levelling the earth.

Phase 3

Fundraising in Progress

Budget £

3000

Senior School Lunchshade

We already installed a primary school lunch shade and wish to do the same for the senior school to enable students to eat and socialise outside

Phase 3

Fundraising in Progress

Budget £

5000

School Bus

A bus is needed to enable the children to participate off-site, especially related to vocational and sporting activities.

Phase 3

Fundraising in Progress

Budget £

70000

CCTV

CCTV is required to monitor activity on site, especially since some of our children are under protection orders from violent family members

Phase 3

Fundraising in Progress

Budget £

5000

Blankets

Now that we have more beds we require additional blankets

Phase 3

Fundraising in Progress

Budget £

3000

New Uniforms

From time to time, new uniforms are required

Phase 3

Fundraising in Progress

Budget £

10000

Repurpose Biogas Area

Now that we have connection to the mains sewage we can re-purpose the area containing the iogas unit.

Phase 3

Fundraising in Progress

Budget £

7000

Sinks for Science Labs

An additional Ministry of Education requirement

Phase 3

Fundraising in Progress

Budget £

600

Paving of roads and pathways

All internal roads and pathways are currently mud. By paving them we will improve safety, and especially cleanliness during rainy periods.

Phase 3

Fundraising in Progress

Budget £

20000

Vocational Centre Land

The land acquired with the house needs to be cleared and flattened ready for future vocational use

Phase 3

Fundraising in Progress

Budget £

5000